Evido EAD-B1000 Instrukcja Użytkownika Strona 55

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 103
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 54
TelVue HyperCaster
®
User Manual / v4.3 / July 2014
© 2014 TelVue Corporation 16000 Horizon Way, Suite 500, Mt. Laurel, NJ 08054
HyperCaster
®
is a registered trademark of TelVue Corporation 800-885-8886 / www.telvue.com
54
Past events can be viewed. Display the list of events on the Programming page, making sure the Hide
History box is unchecked. Click on the View action for the event. The example below shows the data
for a playout.
.
The information supplied when the playout was added is displayed in the Playout Detail screen. In
addition, the screen displays status information.
Completed The event ran normally.
Ended Early/LateThe event stopped early or late.
Missed The event did not play.
Terminated The operator stopped the event.
To return to the Programming page, click the Close button at the bottom right of the screen.
Event Actions: Modify
To change some information about an event, click its Modify action. The information displayed is
identical to the information completed when the event was added but includes the event’s status.
Pending or Scheduled The event is scheduled but has not yet happened. It can still be
modified.
Started The event is currently playing or happening. It cannot be modified. If you need to
stop the event, go to the Dashboard and click the Stop button under the event.
When modifying an event you can change:
Program GuideAdd the event to the Program Guide listing, or remove it if it is already
included.
Metadata Track or override the content metadata.
Optional RecurrenceYou can modify all recurrences or just this event. If you change
anything and want it to apply to all recurrences of the event, check the Update all recurrences
in this series? box.
When you have finished modifying the event, click the Save button to return to the Programming
page, or click the Cancel button to return to the programming page without changing anything.
Event Actions: Adding Subsequent Events
Use the action symbols to schedule others events immediately after this one.
+ “Plus” Follow this event with another of the same type.
p “Playout” Schedule a playout event after this event.
s “Stream”Schedule a stream event after this event.
x “Cross”Schedule a switch event after this playout, or a playout after this switch event.
Przeglądanie stron 54
1 2 ... 50 51 52 53 54 55 56 57 58 59 60 ... 102 103

Komentarze do niniejszej Instrukcji

Brak uwag