Channel & Content
• Channel – Select a channel from the drop-down list.
• Feed – Select a feed from the drop-down list.
• Duration – Fill in the time you want to stream from the channel in hours, minutes, and
seconds (HH:MM:SS).
Date & Time
• Start – Use a Calendar icon to select a date for the stream event to begin up to one year from
now.
• Time – Enter a start time for the stream event in HH:MM:SS format using 24-hour time. For
example, 1:00 PM is 13:00:00.
• Stream Immediately – To start streaming as soon as the Save button is clicked, check this
box.
• Cancel Conflicting Events – Check this box if you want the current stream to take
precedence over any previously-scheduled events.
Optional Recurrence
• Day of Week – Check one or more boxes to the left of the day of the week to repeat the
stream on that day. To repeat this stream every day, click Daily, which will check all the
boxes. To uncheck all the boxes, click None. There is a one-year limit on scheduling stream
events.
• Until Date –Use a Calendar icon to select the last day for the stream to recurup to one year
from today. If you plan to stream from this channel several days per week, it will occur up to
and including the date you select.
Optional Program Guide Data
This program guide data will become the metadata for the stream.
• Program Code – Enter a code that distinguishes what program this is, if program codes are
used in this installation.
• Episode Code – Enter a code that distinguishes what episode of a series this is, if episode
codes are used in this installation.
• Program – If this installation does not use program codes, enter the name of the program.
• Episode – Enter the name of the episode, if applicable and if this installation does not use
episode codes.
• Description – Enter a detailed description of the stream event.
3. Click the Save button to add the stream event to the schedule.
4. The server checks for errors. If none are detected, the Programming page is displayed with the
new stream.
Scheduling Conflicts and Ripple
You can schedule several types of events at once, as long as they do not conflict with one
another. For example, you can schedule a playout and an overlay to run at the same time. Likewise
Komentarze do niniejszej Instrukcji